Elastomeric Bridge Bearings – Precision hydrodemolition to expose bearings for replacement

Hydrodemolition Concrete Cutting Bearing Replacement Volkerlaser Eastcliff Viaduct 10066 Dover Bridge 54

Precision hydrodemolition is possibly the most versatile, advanced method to remove defective concrete whilst protecting and preserving the steel reinforcement.

One of our recent precision Hydrodemolition projects involved a series of six piers with twin stubs supporting an overhead roadway. Each stub is fitted with an elastomeric bearing which requires routine replacement and meant 4.6m3 of concrete needed to be removed from each pier to access the bearing.

Continuous port activity and the bearings being situated below the road deck, meant RGL faced the added challenge of working in an extremely enclosed space.

Hydrodemolition Concrete Cutting Bearing Replacement Volkerlaser Eastcliff Viaduct 10066 Dover Bridge 39

Deploying two UHP precision Hydrodemolition teams to the location, using 2800 bar hand-held safety lances, the concrete was removed from around the bearing and reinforcing bars.

Adding to the complexity of the project, there was a possibility that hazardous materials may be present in the structure so RGL teams worked alongside removal and disposal specialists to manage the risk.

Hydrodemolition Concrete Cutting Bearing Replacement Volkerlaser Eastcliff Viaduct 10066 Dover Bridge 11

The use of precision UHP over HP ultimately gave RGL the ability to carry out the demolition in layers, minimising unintentional breakout and leaving the area clear for the main contractor to replace the bearings before recasting the concrete. RGL also ensured any wastewater generated was treated prior to being discharged into the site’s drainage system

Hydrodemolition Concrete Cutting Bearing Replacement Volkerlaser Eastcliff Viaduct 10066 Dover Bridge 40

Working within a busy shipping port that is undergoing other site building projects meant RGL were faced with additional challenges including:

  • Busy roads and crowded temporary works areas
  • Small, enclosed workspace
  • High volume of temporary site works supporting the bridge reduced the available working area.

Hydrodemolition has the following advantages over traditional demolition methods.

  • Limited noise pollution
  • Reduced dust pollution
  • Cost-effective
  • Time-effective
  • No microfractures in the remaining structure
  • Creates a high-quality bonding surface
  • Precise concrete removal
  • No damage to reinforcement bar
  • No Vibration / HAVs concerns

Our water jetting services

Industries We Serve

More case studies

Read our case studies to learn how we’ve helped clients make projects a success and stay at the top of our ever-changing industry. Whatever the problem, we always aim to create solutions that deliver the best possible result.

RGL are the UK’s leading interface between water jetting technology and the job to be done.

Call us on 02380 817 160 or request a call back.